Uninterruptible Power & Data-Centre Distribution Solutions

UPS Runtime Configuration

72KVA UPS — 8-hour backup configuration

Rated power
72KVA
Backup time
8 h
Emerson Adapt-PM-72KVA-90K frame

Matching UPS

Emerson Adapt-PM-72KVA-90K frame

Other backup times30 min1 h2 h4 h8 h
Plan 1Long machine 72KVA 8 hour hour configuration scheme Y = 1200
  • Host:Emerson Adapt-PM-72KVA-90K Framework
  • Empty opening:NSX160F_DC_3P_160A

    Quantity: 13

    Battery DC switch cabinet
  • battery cabinet:RC40

    Quantity: 12
    Battery:Ruiwu RW-G-12-100

    Quantity: 12 groups of 480 blocks
    Connection line:50 square battery connection line

    Quantity: 481
  • Main component
  • Model
  • Brand
  • Quantity
  • Weight
  • Dimensions
  • Unit price (RMB)
  • Subtotal (Yuan)
  • Battery:
  • Ruiwu RW-G-12-100
  • Ruiwu
  • 12 groups    480 block
  • 480*30.50kg
  • 330*171*214mm
  • 1,638.00
  • 786,240.00
  • battery cabinet:
  • RC40
  • Ruiwu
  • 12 groups
  • 12*0.00kg
  • 0*0*0mm
  • 0.00
  • 0.00

  • Battery switch box
  • Model
  • Brand
  • Quantity
  • Weight
  • Dimensions
  • Unit price (RMB)
  • Subtotal (Yuan)

  • Service
  • Service Name
  • Unit price
  • Quantity
  • Subtotal (Yuan)
  • Installation and transportation costs:
  • Host installation fee
  • 2500.00
  • 1 unit
  • 2,500.00
  • Battery installation fee
  • 20.00
  • 480 only
  • 12,100.00

Total: 15,000.80kg 1,077,115.00.00Scenario Download (Execl)Submit order

Installation parameters

Long machine installation parameters