Uninterruptible Power & Data-Centre Distribution Solutions

UPS Runtime Configuration

120KVA UPS — 1-hour backup configuration

Rated power
120KVA
Backup time
1 h
Delta GES-HPH-120K

Matching UPS

Delta GES-HPH-120K

Other backup times30 min1 h2 h4 h8 h
Plan 1Long machine 120KVA 1 hour hour configuration scheme Y = 312
  • Host:Delta GES-HPH-120K
  • Empty opening:NSX400FDC

    Number of: 4

    Battery DC switch cabinet
  • battery cabinet:RC32

    Quantity: 3
    Battery:Eaton ETNHF12-390WP

    Quantity: 3 groups of 96 pieces
    Connection line:120 square battery connection line

    Number of: 97
  • Main component
  • Model
  • Brand
  • Quantity
  • Weight
  • Dimensions
  • Unit price (RMB)
  • Subtotal (Yuan)
  • battery cabinet:
  • RC32
  • Love Pace
  • Group 3
  • 3*0.00kg
  • 828*974*1112mm
  • 0.00
  • 0.00

  • Battery switch box
  • Model
  • Brand
  • Quantity
  • Weight
  • Dimensions
  • Unit price (RMB)
  • Subtotal (Yuan)
  • DC air on:
  • NSX400FDC
  • Schneider Electric
  • 4 groups
  • 6.00kg
  • 4*255*185*110mm
  • 0.00
  • 0.00

  • Service
  • Service Name
  • Unit price
  • Quantity
  • Subtotal (Yuan)
  • Installation and transportation costs:
  • Host installation fee
  • 5000.00
  • 1 unit
  • 5,000.00
  • Battery installation fee
  • 20.00
  • 96.
  • 6,920.00

Total: 3,072.00kg 11,778.00.00Scenario Download (Execl)Submit order

Installation parameters

120KVA input AC 380V: output AC 380V
Input parameter
Input voltage 380V AC
Input live conductor size 120mm2
Input neutral conductor size 120mm2
Input earth conductor size 50mm2
Input breaker 250A -Input AC 380V: Output AC 380V
Output parameter
Output voltage 380V AC
Output conductor size 95mm2
Output neutral conductor size 95mm2
Output earth conductor size 50mm2
Output breaker 200A -Input AC 380V: Output AC 380V
Battery specifications
External battery breaker 200A-Input AC 380V: Output AC 380V
External battery cable size 95mm2