Uninterruptible Power & Data-Centre Distribution Solutions

UPS Runtime Configuration

5KVA UPS — 1-hour backup configuration

Rated power
5KVA
Backup time
1 h
APC SU5000UXICH

Matching UPS

APC SU5000UXICH

Other backup times30 min1 h2 h4 h8 h
Plan 1Long machine 5KVA 1 hour hour configuration scheme Y = 104
  • Host:APC SU5000UXICH
  • battery cabinet:RC4

    Quantity: 1
    Battery:Eaton ETNHF12-390WP

    Quantity: 1 group of 4 pieces
    Connection line:6 square battery connection line

    Number of: 5
  • Main component
  • Model
  • Brand
  • Quantity
  • Weight
  • Dimensions
  • Unit price (RMB)
  • Subtotal (Yuan)
  • Host:
  • APC SU5000UXICH
  • APC (Schneider Electric)
  • 1
  • 1*71.36kg
  • 439*229*665mm
  • 0.00
  • 0.00
  • Battery:
  • Eaton ETNHF12-390WP
  • Eaton Battery
  • Group 1    4 pieces
  • 4*28.50kg
  • 339*170*220mm
  • 0.00
  • 0.00
  • battery cabinet:
  • RC4
  • Love Pace
  • Group 1
  • 1*0.00kg
  • 499*499*572mm
  • 0.00
  • 0.00

  • Battery switch box
  • Model
  • Brand
  • Quantity
  • Weight
  • Dimensions
  • Unit price (RMB)
  • Subtotal (Yuan)

  • Service
  • Service Name
  • Unit price
  • Quantity
  • Subtotal (Yuan)
  • Installation and transportation costs:
  • Host installation fee
  • 1000.00
  • 1 unit
  • 1,000.00
  • Battery installation fee
  • 20.00
  • 4 only
  • 1,080.00

Total: 186.56kg 1,610.00.00Scenario Download (Execl)Submit order

Installation parameters

5KVA AC 220V input: AC 220V output
Input parameter
Input voltage 220V AC
Input live conductor size 4mm2
Input neutral conductor size 4mm2
Input earth conductor size 4mm2
Input breaker 32A -2P
Output parameter
Output voltage 220V AC
Output conductor size 4mm2
Output neutral conductor size 4mm2
Output earth conductor size 4mm2
Output breaker 32A -2P
Battery specifications
External battery breaker 75A-2P
External battery cable size 6mm2